Another major milestone was passed at the end of September as the 30 tonne surface of our biaxial shaking table was lifted into its final position. The four actuators have since been installed around the table, and once the final hydraulic hoses have been connected, physical installation within the facility will be complete. The next significant event will be acceptance testing of the table which is expected towards the end of November, and will mark the final activity before the faculty is handed to the University.